INF
Infrastructure
Planning, asset information and digital representations for the networks that have to be operated, not just built.
Infrastructure is a long argument with maintenance. Hyperistica helps owners describe what they have, what condition it is in, and which interventions are actually justified — roads, water, energy and the corridors that connect them.
The work is usually a combination of the register, the model and the rules that keep them in step. A model nobody updates is a picture. We design the update path at the same time as the first delivery.
Asset information
- Asset registers and identifiers
- Condition and intervention records
- Data gaps and verification
Network models
- Asset-linked geometry
- Network views
- Register and model coordination
Information maintenance
- Inspection update workflows
- Project and defect change rules
- Information handover and maintenance notes
What we hand over
- An asset breakdown the owner recognises, mapped to the identifiers they already use
- Condition and intervention data with a source and a date on every record
- A model or network view that cites the register instead of copying it
- Rules for what an inspection, a project or a defect is allowed to change
- A gap list: assets we could not verify, and what it would take to close them
- A maintenance note for the information itself, not only for the physical assets
01How an engagement runs
- 01
Start from the register
We read the registers, drawings and habits that already exist. Replacing an identifier scheme is a last resort.
- 02
Separate fact from guess
Each attribute is marked as measured, inferred or unknown. Unknown is an acceptable value. Invented precision is not.
- 03
Connect the model
Geometry is joined to the asset, not stored beside it in a file nobody opens. The join is something we can test.
- 04
Leave an update path
Inspections and projects have a defined way back into the register. Otherwise the first delivery is also the last accurate one.
Related profiles
- Practice profileInfrastructureGeospatial & Geomatics
A water network register people will plan against
An owner whose drawings, GIS and job histories describe different networks, and who needs one register honest enough to schedule work from.
Read - Practice profileGeospatial & GeomaticsCivil Engineering
Corridor survey to a design model
A transport corridor where the survey, the alignment and the asset register need to be one coordinate system, not three files that happen to look similar.
Read
Questions
Who owns the data and the models?
The client owns their source data, and they own the deliverables once they are paid for, unless a proposal says otherwise. We hand over open formats where a format exists — model files, GeoPackage, LAS, documented databases — and we do not keep a private copy as the system of record.
Third-party datasets stay under their own licences. We list those licences in the handover instead of implying they transferred.
Can you work with the GIS or survey stack we already have?
Yes. Replacing a tool is not the default. We would rather write a clean exchange, a database the current GIS can read, or a specification your existing field teams can follow. A new platform has to earn its place against the cost of moving people onto it.
How are progress and decisions recorded?
Decisions that change scope, geometry or a published dataset are written down: what changed, why, and which file it supersedes. Progress is against the scope in the proposal, not against a percentage invented for a slide. You can see the current set of files throughout, not only at the end.
Start a conversation
Have a project in the digital or the physical world?
Tell us the problem, the site and the timeline. We reply within two business days with an honest view of whether, and how, we can help.


